Skip to content
CovaSyn
Book an initial call

The data is measured. Nobody has evaluated it yet.We deliver the report. You release it.

Structure confirmation, impurities, stability to ICH Q1E, ICH M7, solubility, DoE and synthesis routes for pharma, CDMOs, contract labs and chemicals. Checked by PhD scientists.

30 minutes on Microsoft Teams with the CovaSyn team. If it is not a fit, we will say so.

All questions by areaHow an assignment runs

Evaluation report

Shelf life per ICH Q1E

CovaSyn

Result

24 months supported, limit reached after 31 months.

Question
Do the stability data support a 24-month shelf life?
Method
Regression per ICH Q1E, 95 % confidence limit, poolability tested
Assumptions
Storage at 25 °C and 60 % RH, three batches, assay and degradant B
Limits
No statement on storage outside the tested conditions

Reviewed

PhD scientist, CovaSyn

Approval

Your expert

Example report with fictitious data.

Your position is open.The evaluations are not.

The analytical position has been open for months, your stability colleague is on parental leave, and in November three studies hit a time point at once. We evaluate what comes in during that time, with reasoning and calculation path. Nobody has to be hired or onboarded.

How an assignment runs

From data set to a report you can release.

Nothing is installed on your side. You need the data set, the question and 30 minutes.

  • 1. Discuss the case

    30 minutes on Microsoft Teams about the compound, the question and the data. Afterwards you know whether we take the case and which data is missing, and you receive the offer in writing.

  • 2. Hand over the data

    Raw data and context, such as spectra, chromatograms, stability tables and the specification. The report typically arrives within 5 working days once we have your complete data.

  • 3. Review and release

    The report states its data basis, calculation path and limits. Your reviewer checks it against the raw data, and you release it in your own quality system.

What you get

A report your reviewer can check against the raw data.

  • The answer

    Assignment, structure, classification, shelf life, route or method, in one sentence at the top of the report.

  • The reasoning

    Every step with the input data it rests on and the calculation behind it.

  • The regulatory reference

    Where it matters, with a reference to the guideline, such as ICH Q1E, ICH M7, ICH Q2(R2) or USP <621>.

  • The limits of the statement

    What the evaluation shows and what only a measurement in your lab can confirm.

  • The next measurement

    Where the data falls short, the report states which measurement settles the question, such as an HSQC, a reference standard or another stability time point.

  • Ready for your files

    As a PDF with version and date, structured to attach to a deviation, OOS report or development report.

Security and data protection

Your data stays protected.

  • Hosted at Hetzner in Nuremberg, data kept in the EU
  • Your data used only for the agreed purpose
  • GDPR Art. 28 DPA, ready to sign on request
  • Deletion on request within 30 days, backups included
  • Source reference and calculation path for every result
Trust center

FAQ

Frequently asked questions

Which evaluations does CovaSyn take on?

In analytics we confirm structures from NMR, MS and IR and narrow down unknown impurities from LC-MS. In quality we evaluate stability to ICH Q1E, assess impurities under ICH M7, run forced degradation with mass balance and support OOT, OOS and E&L. In development it is solubility, crystallization, design of experiments and the synthesis route to a target molecule. Add to that HPLC starting methods, method transfer and process capability as Cpk and Ppk.

Who checks the result, and who releases it?

A scientist with a PhD checks every report before it leaves our hands. We are responsible for the evaluation and its reasoning. Assessment and release are yours, under your quality system.

How does working together start?

With an initial call, 30 minutes on Microsoft Teams, about the compound, the question and the data. Afterwards you know whether we take on the case, which data we need and when the report will arrive. Nothing to install or set up.

Can we use the report in a GMP environment?

Yes, as the basis for your assessment. Every report states input data, calculation path and version. Where your supplier management requires it, we sign a quality agreement, answer the supplier questionnaire and are available for an audit.

Where is our data kept?

Hosted at Hetzner in Nuremberg, data kept in the EU. Your data used only for the agreed purpose. Deletion on request within 30 days, backups included.

How reliable are the results?

Every report is checked by a scientist holding a doctorate before it is sent. Every statement is in the report with its data basis, calculation path and limits, verifiable against your raw data. Where the data fall short, the report names the measurement that settles the question.

Next step

Which evaluation is waiting on your desk?

30 minutes on Microsoft Teams. Bring the case, ideally with a sample data set. Afterwards you know whether we take it on, and you have the offer in writing.